Elba Island Project

Roll Group solution:

Over the two-year period on the project site, Roll-Lift USA overcame many obstacles to safely and successfully execute all work performed at the Elba Island Project.

The first challenge to overcome was the low weight limit and deteriorating condition of the only access bridge on to the island. This posed a huge problem for the delivery of process/pipe rack modules and heavy plant equipment components. The solution was to barge the modules from the offsite fabrication facility located 10 miles away along the Savannah River to the project site. SPMTs were used to roll the modules on to the barge at the fabrication yard and used again to roll off at the project site.

Another issue with the delivery of the cargo were the poor ground conditions at the project roll off location. Roll-Lift designed in house the hefty 85ft RoRo ramps used to bridge over the poor ground and still maintain the capacity required to handle the loads imposed. Over 800 heavy crane lifts were planned and performed over the course of the project.

MarketModules - LNG
Start2017
Completion2019
Work typeLifting & transport
Discharge methodRoll-on, Lift-on
CargoPiperack modules & larger parts
For this project

Fleet & Equipment used.

For every project, we use state-of-the-art equipment and experienced people to complete projects safely and efficiently.

Want to know more about this project?

Leave your details and we’ll contact you with more information about our project planning and logistical services.

Name