The Netherlands to Pakistan

For account of IHC Beaver Dredgers BV mv ROLLDOCK SUN loaded 3900mt cutter dredger in Rotterdam.

Loading was done by means of floflo. The crew already installed all cribbing wood during the mobilistation voyage so the ROLLDOCK SUN could start with loading on arrival.
It was a tight fit as there was only 5 centimeters space between the dredger and ROLLDOCK SUN's dockwalls. After discharging the 1st dredger the vessel returned to Rotterdam to load an identical dredger and discharged this also in Karachi.