Loadout of Calm Buoys

Roll-Lift USA were contracted to undertake the load-out of 2 Calm Buoys in readiness for the final leg of their journey to the Gulf of Mexico.

Our client requested the buoys to be positioned along the dock prior to load out – but found the incoming transport vessel was drafting too deep to access the client’s dock.

Roll-Lift offered a solution of loading the buoys onto the drydock, enabling the transport vessel to come alongside in deeper water and successfully receive the buoys. SPMT’s were used to facilitate the Load-Out of the 485 Tonne Buoys.

Safety, Health, Environment and Quality (SHE-Q)

About Roll Group

Rolldock

Roll-Lift